It's starting to look like a driveway now.
Today the base layer of rock was spread over the membrane.
A drainage pipe was installed under a portion of the driveway, I'm not sure where that's going to drain to as of yet.
Another layer of rock will go on top of this layer, and that will be it for the driveway.