The seven large support posts for the front porch roof are now in place.

We altered the shower a bit, angling the front corner and adding a half wall and a triangular bench in the back.  I think it turned out nice.

The wiring is pretty much done.  Most of the electric, coax and cat4e cable has been run.  The breaker box is in the garage, and right next to it is the networking, phone and video box which will house and organize all of the coaxial, phone lines and cat5e cable.